Iowa Aviation System Plan Public Webinar #2 (Final) - July 1, 2021 at 1 PM CST
Microsoft Teams Meeting
Join on your computer or mobile app
Click here to join the meeting
Or call in (audio only)
+1 937-240-2430,,184602733# United States, Dayton
Phone Conference ID: 184 602 733#
Find a local number | Reset PIN
Learn More | Help | Meeting options
Welcome to the official information web portal for the 2020 Iowa Aviation System Plan. This collaborative process will be conducted through the Spring of 2021 and will involve the 115 system airports and their communities; the Iowa Department of Transportation’s Aviation Bureau; the Federal Aviation Administration (FAA); and other regional, state, and federal organizations and groups with aviation interests.
We look forward to hearing from you during this important project.
The current Iowa Aviation System Plan was completed in 2010. Since that time, conditions at many of the airports have changed, as has the aviation landscape, both nationally and in Iowa. The 2020 Iowa Aviation System Plan will build on the 2010 plan and will provide Iowa DOT with a fresh look at how the system is performing. It is anticipated that the study will be completed in the Spring of 2021.
The consultant team for this study is led by Jviation, with assistance from McClure Engineering and Marr Arnold Planning. The Aviation Bureau plans to use the results from the system plan update to: identify projects and airports that are most critical to the success of the state’s airport system; make informed decisions on strategic investment needs; and provide individual system airports with information so they are positioned to resolve local deficiencies and gaps as part of their individual planning efforts.